Custom Industrial Equipment Manufacturing Case Study: Throughput Doubled: Revision history

From Wiki Planet
Jump to navigationJump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 November 2025

  • curprev 03:1803:18, 13 November 2025Borianfzcz talk contribs 22,573 bytes +22,573 Created page with "<html><p> A few years ago, a regional Manufacturer of bulk material handling systems called with a familiar problem. Their flagship line - a modular classifier and conveyor package used in aggregate yards - was selling, but deliveries kept slipping. They were losing orders to a competitor promising faster lead times. The product wasn’t new, and neither was the cause of the delays. The process had grown chaotic as volumes increased: late parts from suppliers, bottleneck..."