Main stages of repair in the apartment.
How to begin repair works of the apartment?
The very first phase of the repair work of old houses is the destruction and taking apart firstly of the shabby walls and partition walls, eliminating the wall and ceiling coating. This phase is one of the most "dirty" phases of the repair work.
One more amongst the most essential and "dirty" works is the window block replacement. It is essential to do this firstly because dirt and dust will be unallowable throughout following stages and it is prohibited at all to open windows during painting and wallpaper works (big drops of the temperature level and moisture are unallowable). After mounting windows and windowsills it is required to load them instantly in polyethylene movie and to cover windowsills in addition by the fiber board (in order to prevent scratches).
The following stage is wiring. Circuitry can be set up in walls or along the floor. Circuitry is made inside the pipelines to make sure electrical security and boost reliability. The pipe protects circuitry from external damages and allows to replace the wire totally without breaking walls and floor simply by plumber melbourne placing the new wire instead of the old one.
House Painting follows the electrical wiring. The frequent error during the synchronised conducting of such works occurs when workers forget to lay out one of the cable televisions and home painters have currently plastered and smoothed out the wall. As an outcome, additional works are essential to seal chases on the ended up wall. The locations of the feed switch and wall outlet place and their number need to be thought-out in advance. The scheme of power circuitry is normally included into the design project.
Later on the system must be ready to service in case of failures. In addition to the wirings, the telephone cable television and the TV cable television are laid out. The power cable television need to not be laid out near the telephone and antenna cables to avoid sound pickup and interference. The most strange moment is setting out the TV cable. In order to make two (or 3) TV sets in the house the 2nd cable is often merely "firmly soldered" in parallel, so the cable resistance is decreased. As an outcome, the display screen quality is deteriorated, many programs can't be gotten and etc. In order to prevent such scenario it is necessary to invite a specialist with special equipment. He will determine the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.
Painting is the most long-lasting procedure, that is why it is performed concurrently in all facilities, if it is possible. Delays are related to the innovation. Each applied layer of the plaster (or filling out ending up) must dry entirely before the work will continue.
Works in hygienic plans and the kitchen start concurrently with house painting. It is better to meet so-called "unclean" works in the top place and simultaneously. In accordance with the strategy of the sanitary technician location welding, wall chasing and pipeline run are conducted. Steam radiator admissions are prepared, taps and brackets are installed, but radiators are not installed.
Then operates in sanitary plans are carried out according to the strategy. The bath is installed, then walls are smoothed out and the tile is laid on walls. The list below phase is putting together ceiling and laying tiles on the floor. And at last other sanitary gadgets, mixers and devices are mounted.
After circuitry, installation of rosette plates and terminal boxes the voltage is signed in all point. Ends of wiring are insulated and laid out into rosette plates. Sockets and breakers are not set up during this stage in order to conserve their surface area appearance. The finish puttying of walls is performed simultaneously. The technologically exact control of drying of the layer of the plaster (filling) is carried out by drymeter. It is a special instrument that measures moisture of the material.
The following stage is the process of fill. Fill can be made with various products-- from typical masonry cement-sand mixture to self-aligning floorings. The benefit of the easy mix is its cheapness, the disadvantage is that such mix is much harder lined up at the level and the last dry time of such fill is 40 days, just then the next phase of the work with floor can be carried out, i.e. the period is too long. Self-leveling self-aligning floors are much more pricey, but more technological. Lining up takes place nearly "automatically" i.e. fluid solution of mixture is poured out, then it runs and you receive the horizontal surface. The last dry time is 15 days i.e. you have significant time economy. The system "warm flooring" is installed into the fill. If the so-called "damp procedures" are inapplicable the technology of the dry aligning (the fill innovation) is utilized bases for floorings with adjustable flooring battens are mounted.
After fill door boxes and door are set up. Installation of doors must take into the account thickness of future flooring covering. After setup the door can be taken off its hinges and got rid of up until the end of repair work or loaded into polyethylene film to protect from damages. Simultaneously ceiling can be painted and the tile can be laid in that properties where it was prepared. The tile should be laid on the absolutely dry overlay.
Finishing of the floor mounting depends upon the planned covering. For the most part (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are repaired to the flooring by self-tapping screws. One plywood sheet is repaired by 30-50 self-tapping screws to offer the close repairing of plywood and long-lasting service of the flooring without squeak and bulging. The plywood provides the extra heat- and acoustic insulation. After mounting of the plywood is finished, wallpaper for painting can be pasted on walls.
In premises where surface covering of the flooring is laminated floor covering or parquet hoard, the ordinary wallpapers are pasted (not for painting) in the very first location. Then the floor covering is mounted.
If surface covering of the flooring is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the common wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending on the quality of the parquet and lacquer). The mentioned consequence is linked just with such scrambling process when the fantastic amount of dust is developed. In spite of the reality that excellent floor grinders are equipped with the vacuum cleaner, the adequate amount of dust is precipitated on surrounding topics consisting of walls. Dust is really acerbic and is badly washed off. That is why in order not to harm wallpapers, they are pasted after rushing and in order the parquet do not take in the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.
After this the main works can be considered to be ended up. It is left only to install the plinths, ornamental aspects, breakers and sockets, curtain holders, to hang doors, plant-bands and others.
In conclusion it is needed to keep in mind that the series of works was noted in general and can change depending upon the guaranteed scenario-- the variety of rooms in property, your resources, peculiarities of the building of the multilevel facilities. It is based upon common sense and every person efficient in analysis can independently produce such a series.