Main phases of repair works in the house 93656
Main phases of repair works in the apartment.
How to begin repair works of the apartment?
The very first phase of the repair of old apartment or condos is the damage and taking apart to start with of the dilapidated walls and partition walls, getting rid of the wall and ceiling finishing. This phase is among the most "unclean" phases of the repair.
One more among the most important and "dusty" works is the window block replacement. It is essential to do this to start with because dirt and dust will be unallowable during following stages and it is prohibited at all to open windows throughout painting and wallpaper works (big drops of the temperature level and moisture are unallowable). After mounting windows and windowsills it is essential to pack them instantly in polyethylene movie and to cover windowsills in addition by the fiber board (in order to prevent scratches).

The following phase is electrical wiring. Circuitry can be set up in walls or along the flooring. Circuitry is made inside the pipes to ensure electrical safety and increase dependability. The pipeline secures electrical wiring from external damages and permits to change the wire totally without breaking walls and floor merely by placing the brand-new wire instead of the old one.
House Painting follows the electrical wiring. The frequent mistake during the trusted plumber Mount Martha synchronised conducting of such works takes place when employees forget to set out one of the cables and home painters have actually already plastered and smoothed out the wall. As a result, extra works are required to seal chases after on the completed wall. The locations of the feed switch and wall outlet area and their number need to be thought-out beforehand. The scheme of power wiring is normally included into the design project.
Later on the system should be prepared to service in case of failures. In addition to the circuitries, the telephone cable and the television cable television are laid out. The power cable must not be laid out near the telephone and antenna cable televisions to prevent noise pickup and disturbance. The most peculiar minute is laying out the television cable. In order to make two (or 3) television set in the apartment the second cable is often just "firmly soldered" in parallel, so the cable television resistance is reduced. As an outcome, the display quality is weakened, lots of programs can't be received and etc. In order to prevent such circumstance it is essential to welcome a professional with special devices. He will measure the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.
Painting is the most long-lasting process, that is why it is carried out simultaneously in all properties, if it is possible. Hold-ups are related to the technology. Each applied layer of the plaster (or filling in ending up) should dry entirely before the work will continue.
Works in sanitary arrangements and the kitchen begin at the same time with home painting. It is much better to satisfy so-called "filthy" works in the top place and concurrently. In accordance with the plan of the sanitary technician area welding, wall chasing and pipe run are conducted. Steam radiator admissions are prepared, taps and brackets are mounted, however radiators are not installed.
Then works in sanitary arrangements are conducted according to the plan. The bath is installed, then walls are smoothed out and the tile is laid on walls. The following stage is putting together ceiling and laying tiles on the flooring. And at last other hygienic devices, mixers and accessories are mounted.
After circuitry, installation of rosette plates and terminal boxes the voltage is signed in all point. Ends of wiring are insulated and laid out into rosette plates. Sockets and breakers are not installed during this phase in order to conserve their surface area look. The finish puttying of walls is carried out all at once. The technologically precise control of drying of the layer of the plaster (filling) is performed by drymeter. It is a special instrument that determines moisture of the material.
The following phase is the procedure of fill. Fill can be made with different products-- from normal masonry cement-sand mix to self-aligning floors. The benefit of the simple mix is its cheapness, the downside is that such mix is much more difficult lined up at the level and the last dry time of such fill is 40 days, just then the next stage of the work with flooring can be conducted, i.e. the period is too long. Self-leveling self-aligning floorings are a lot more expensive, but more technological. Lining up takes place practically "instantly" i.e. fluid solution of mixture is poured out, then it runs and you receive the horizontal surface. The last dry time is 15 days i.e. you have significant time economy. The system "warm flooring" is installed into the fill. If the so-called "damp processes" are inapplicable the technology of the dry aligning (the fill innovation) is utilized bases for floors with adjustable floor battens are mounted.
After fill door boxes and door are installed. Setup of doors must take into the account thickness of future flooring covering. After setup the door can be taken off its hinges and eliminated until the end of repair or loaded into polyethylene movie to safeguard from damages. Simultaneously ceiling can be painted and the tile can be laid in that premises where it was prepared. The tile should be laid on the absolutely dry overlay.
Finishing of the floor mounting depends upon the planned covering. For the most part (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the flooring by self-tapping screws. One plywood sheet is repaired by 30-50 self-tapping screws to supply the close repairing of plywood and long-term service of the flooring without squeak and bulging. The plywood provides the extra heat- and acoustic insulation. After installing of the plywood is ended up, wallpaper for painting can be pasted on walls.
In properties where surface covering of the flooring is laminated floor covering or parquet stockpile, the common wallpapers are pasted (not for painting) in the very first location. Then the flooring covering is mounted.
If surface covering of the flooring is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the regular wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending on the quality of the parquet and lacquer). The pointed out consequence is connected only with such rushing process when the excellent amount of dust is produced. In spite of the fact that good flooring grinders are geared up with the vacuum cleaner, the enough amount of dust is sped up on surrounding subjects consisting of walls. Dust is very acerbic and is badly cleaned off. That is why in order not to damage wallpapers, they are pasted after scrambling and in order the parquet do not soak up the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.
After this the main works can be thought about to be finished. It is left only to install the plinths, ornamental elements, breakers and sockets, curtain holders, to hang doors, plant-bands and others.
In conclusion it is needed to note that the series of works was noted in basic and can alter depending upon the guaranteed scenario-- the variety of spaces in facility, your resources, peculiarities of the building of the multilevel premises. It is based on common sense and everyone efficient in analysis can independently produce such a sequence.