Build an ADU on My Property: Utility Capacity Checklist 42367
An accent residence unit lives and dies on infrastructure. Plans and finishes get all the awareness, however the piece that determines price range, agenda, and livability is most of the time the invisible internet of pipes and wires under your toes. If you’ve typed “construct an ADU on my estate” or called an ADU contractor close me, you’ve already felt the tug of allowing and making plans. Before you signal with an ADU building brand, form out utility capacity. It is the change between a smooth 4-month build and a 9-month odyssey with wonder exchange orders.
What follows is a pragmatic walk by way of the big 5 utilities that govern ADU feasibility: electrical, water, sewer, fuel, and documents. I’ll level to actual constraints I’ve seen inside the box, the order I run skill assessments, and the industry-offs that save initiatives on track. Whether you’re working with an ADU layout and construct crew otherwise you’re an owner-builder with a pleasant ADU preferred contractor, this guidelines will help you ask sharper questions and avoid pricey rework.
Start with a site examine: what that you can be taught in an hour
Before a unmarried engineer opens a spreadsheet, which you can collect records on a Saturday morning. Locate the electrical meter and panel, find the water meter and shutoff, trace the sewer cleanout, and walk the route from the road utilities to the deliberate ADU. If you spot a protracted, slender edge backyard, overhead chronic crossing your garden, or mature roots jogging along the fence line, count on coordination time. I lift a sensible non-contact voltage tester, a line locator if feasible, and a telephone loaded with the utility maps. Most cities present approximate software layers online, and so they’re really worth reviewing besides the fact that they’re not survey-grade.
Two brief anecdotes underline why this things. A %%!%%27178c53-0.33-4401-9acd-b5d8010d1aca%%!%% in a 1950s bungalow swore the panel changed into “new,” and it used to be, but the carrier drop and meter had been no longer. We had 2 hundred amps within the panel, one hundred amps on the meter. That mismatch caused a service upgrade and a 3-month wait with the vigour visitors. Another %%!%%27178c53-third-4401-9acd-b5d8010d1aca%%!%% had an ideal sewer line on paper. The cleanout turned into out there, the road pitched effectively, but the path to the hot ADU crossed a extensive liquidambar with roots the size of your forearm. The trench ended up snaking round in a shallow S to circumvent structural roots, and the plumbing workforce mandatory a further day.
Those early observations structure a realistic procedure. You don’t desire fancy instruments to look even if you’re feeding a garden residence throughout 20 feet of lawn or across a hundred and twenty ft of concrete, clay, and tree roots.
How much electric skill you awfully need
ADUs are pressure-hungry in contrast to a garage or studio. The second you switch to all-electrical, the weight climbs: warm pump house heating and cooling, warmness pump water heater, induction cooking, and a code-required laundry circuit. Even a modest four hundred to 800 rectangular foot unit can pencil to 50 to ninety amps based on equipment alternatives. Many jurisdictions allow a calculated load by means of the NEC, which mainly comes in decrease than a naïve sum of breaker ratings, but you still should respect factual-global utilization.
The first fork in the road is even if to subfeed from the principle home panel or install a dedicated carrier for the ADU. Subfeeding is cheaper and faster in case your existing service can take care of it. Dedicated carrier gives you independence, separate metering, and preservation flexibility, but it brings a software program, trenching to the transformer or carrier aspect, and from time to time a brand new pole riser or pad-mount coordination.
When I act as an ADU challenge contractor, I pull the final yr of electric debts to peer historical call for for the most important house. If the house owner has critical AC or an EV charger, the height month tells me rather a lot. I also operate a load calculation for each dwellings in combination. With heat pump approaches, LED lighting fixtures, and a one hundred twenty-volt heat pump water heater, I can characteristically avoid an ADU beneath a 60-amp subfeed. If the main domicile has a two hundred-amp provider and a decent unfold of masses, that’s recurrently possible.
Panels themselves matter. A so-often called “2 hundred-amp” panel from the Nineties with aluminum bus and little breaker house is not really similar to a latest 2 hundred-amp panelboard with copper bus and room for AFCI/GFCI breakers. Service conductors, meter/leading ratings, and the carrier drop or lateral all would have to tournament the final service rating. Utilities will now not upsize the meter just because the panel within says two hundred. An accessory dwelling unit builder who shrugs at these tips is environment you up for alternate orders.
If you decide on all-electric, plan the place the outdoor condensers, disconnects, and provider equipment will pass. Noise, setbacks, and transparent working space observe. If the ADU wall house is tight, a small backyard-rated subpanel on a concrete pad close the unit regularly makes sense. I’ve used NEMA 3R enclosures with a 60-amp principal breaker for blank installs while inside partitions were claimed with the aid of plumbing chases and windows.
EV readiness can tilt the equation. Even if the ADU does not require a charger, many householders plan to add one later. A good panel or load management equipment can defer a carrier improve by means of shaving top plenty. The superior ADU structure professionals will expense these alternatives early and examine them to a software provider replace.
Water provide: rigidity, meter measurement, and pipe runs
Water appears straight forward except you measure pressure under simultaneous pass. An ADU adds one lavatory minimum, repeatedly a moment tub or laundry, and now and again a kitchen with a dishwasher. If you tee off the most important space, you should ensure that the static and dynamic stress will guide equally dwellings throughout the time of height use. Cities on the whole settle for a 3 to 5 gallons-in step with-minute movement try at a hose bib plus a drive read at the meter or fundamental valve. I select to check two furniture straight away to simulate truly lifestyles, as an illustration shower plus kitchen sink. If your rigidity drops below 35 psi in the course of that simultaneous draw, extraordinarily at the home’s some distance furniture, the ADU will possibly undergo.
Meter dimension subjects. A 5/8-inch or three/four-inch meter serves so much single-domestic buildings. With an ADU, some jurisdictions require an upsized meter or maybe a committed 2d meter. Others enable a shared meter but require a backflow instrument and a separate shutoff to the ADU. Upsizing a meter has ripple prices: the per 30 days base check by and large rises, and chances are you'll need to upsize the carrier line from the road to the home, which suggests trenching underneath drives and landscaping. I actually have noticeable meter improvements add 4 to 8 weeks for water district approvals, really in smaller districts.
Pipe fabric and path are where surprises conceal. Old galvanized metal provider strains choke with mineral buildup, slicing movement and pressure. If you've gotten historic galvanized from the Nineteen Forties or Fifties, including an ADU is the instant to change it with Type L copper or prime-density polyethylene. The run to the ADU have got to defend frost intensity in cold climates and evade root zones in which doable. On tight urban an awful lot, I repeatedly run a shared trench for water, chronic, and telecom, with right separations. This saves expense however requires coordination so that the inspector symptoms off spacing between utilities, more often than not 12 inches horizontal and 12 inches vertical separation minimum, with drive above or in conduit.
For indoors distribution, PEX-A with dwelling house-run manifolds works effectively for ADUs. It reduces fittings within partitions and makes long run renovation more convenient. If you plan to meter the ADU’s water usage to allocate costs, a submeter at the ADU’s chilly-water foremost with a distant study head continues it tidy.
Sewer skill and the slope problem
Sewer is wherein rates can swing dramatically, and it can be the single so much average location impact of laws on adu in California I see budgets blow up. A new bathroom crew tied into a antique 4-inch forged iron line can paintings or it may screen cracks and roots that pressure a larger substitute. Start with the basics: uncover the key home cleanout and examine wherein the construction sewer heads to the public foremost. A essential digicam inspection with locating appliance tells you depth, slope, fabric, and situation. Most cities need a 2 p.c minimal slope on new constructing drains, meaning 1 / 4 inch per foot. If your ADU sits in the back of the high element of the backyard, hitting that slope with out going too shallow at the connection is repeatedly impossible devoid of a pump.
Pumps don't seem to be a failure, however they do devote you to long-term renovation. Ejector pumps desire venting, vigour, and an reachable basin. For tiny ADUs, a macerating pump in the back of a bathroom can work, however for a full bog and laundry you choose a excellent grinder or solids-coping with ejector basin set outside or under a slab. When I can, I layout the ADU floor elevation to permit gravity drainage, besides the fact that it skill multiple steps up at the access. Two risers at the edge now can keep lots over the life of the development in pump replacements and alarms.

If you tie into the general public principal, there are two primary options: a wye connection in your latest lateral or a new faucet at the most in the street. Tapping the most triggers encroachment allows, traffic manipulate, and software locating. Costs fluctuate extensively, from some thousand on a quiet residential lane to 5 figures on a hectic arterial with concrete and rebar paving. This is where having ADU experts who comprehend the neighborhood public works team of workers can pay off. Some cities are versatile about tapping at the sidewalk cleanout, others require a new wye at the key regardless.
One greater layer: some jurisdictions require separate sewer capacity costs for ADUs, calculated in similar home contraptions or fixture counts. The stove is broad, from some hundred dollars to greater than ten thousand. Your ADU contractor have to confirm this early, since it influences feasibility and the selection to contain a second bathing room or laundry.
Gas or all-electric: opt for your lane on day one
If you like fuel cooking and feature an latest gasoline service, adding gas to the ADU is seemingly, but it drags along venting, combustion air standards, seismic valves, and carbon monoxide concerns. In many areas, going all-electric powered simplifies the build and pairs effectively with solar. I like warmth pump water heaters for ADUs simply because they sip drive and might are living in a small mechanical closet for those who plan for makeup air. The noise is unassuming, but I nonetheless situation them clear of napping areas whilst practicable.
When we do add fuel, we run a committed line with an exterior shutoff and a meter if allowed. I preclude tying the ADU gas off a long run in the major dwelling considering that tension drops are challenging in older black iron programs. If your principal area has a two hundred,000 BTU furnace and a tank water heater, the handy BTU ability on that half-inch run to the again may not reinforce a brand new 120,000 BTU tankless plus a spread.
More towns have followed achieve codes that motivate or require electric powered appliances in new paintings. An ADU homestead builder who stays current will flag this. Even if gas is permitted, insurers and appraisers increasingly more view all-electrical ADUs as easier. That things on your refinance or sale later.
Drainage, stormwater, and fireplace: the quiet constraints
Stormwater slightly presentations up on many ADU checklists, but it has the chronic to stall a build. Your new roof, patio, and walkways add impervious enviornment. Some towns require on-site infiltration for brought rectangular footage above a small threshold. If your soil percolates poorly, you could possibly desire drywells or shallow infiltration trenches. Plan chief locations, ward off dumping new roof water onto a neighbor, and verify downspout discharges have fantastic daylighting. In wildfire-prone regions, fireplace water availability and hydrant spacing can shape the footprint. A hearth department evaluate may possibly require a wider driveway for entry or a fire-rated wall inside of a selected distance of the belongings line. Those requirements cascade into software routes and appliance clearances.
Telecom and details: small picks, vast livability
Data is not very a luxurious anymore. A six hundred square foot ADU used as a dwelling house place of business or condominium would have to have dependableremember cyber web. Running a conduit for fiber or Cat6 from the major space or from the dealer’s demarcation expenditures little or no at some point of trenching and saves complications later. Wireless bridges are a stopgap, now not a plan. I specify a 1-inch empty conduit from the most distribution point to the ADU with a pull string. If you might have the ditch open for capability and water, drop the info conduit at the traditional separations. A neat deploy with a small based media panel contained in the ADU retains modems and routers off the kitchen counter.
The order of operations that prevents rework
I’ve found out a constant series that cuts probability. First, tough web site examine and software mapping, including a sewer digital camera. Second, load calculations and brief calls with the force and water utilities to ascertain regulations on meters and offerings. Third, initial civil notes on drainage, trench routes, and tree maintenance. Fourth, a speak with the building department to make sure neighborhood quirks: backflow necessities, sub-metering rules, and fireplace get admission to. Only then will we finalize the ADU layout and build package for submittal. It is tempting to push plans faster, however relocating a loo 6 ft to hit a improved sewer run in the course of layout is lower priced when compared to adding a sewage ejector for the duration of framing.
An ADU designer close me once liked stacking the rest room and kitchen at the same wall to save plumbing prices. Good concept, mistaken wall. It used to be the solely wall at the lot line that necessary a 1-hour fireplace score. Penetrations, vents, and window size all had to trade, and the kitchen format suffered. We solved it early due to the fact that the sewer line map pressured us to look at that wall. These are the small dominoes that fall your means while utilities lead the layout.
Budget ranges and where the dollars hides
Numbers vary by way of quarter, yet some styles preserve. Electrical improvements whilst that you can subfeed: about a thousand for a subpanel, trenching, and circuits to the ADU. Dedicated service: quite often 8,000 to 20,000, top if the utility should set a brand new transformer or if the provider lateral requires avenue work. Water tie-in with ok force: one to five thousand, more in the event you will have to upsize the meter or provider line, which will soar through 5,000 to 15,000 based on distance and paving. Sewer connections to present lateral: 3 to ten thousand, assuming good situation. Street faucets: ten to thirty thousand with traffic control. Ejector pump approaches: four to 8 thousand installed, plus destiny repairs.
Hidden quotes love tight spaces. A slender facet yard method hand trenching. Mature timber imply arborist oversight and protecting tunneling beneath roots. Concrete and hardscape demolition multiply trench expenses. If you pay attention an ADU remodeling contractor endorse application allowances devoid of a site discuss with, push for a acceptable stroll-thru and written exclusions.
Permits, inspections, and the rhythm of coordination
Each software has its own jurisdiction and speed. Power vendors have their carrier planners, water districts have backflow coordinators, public works controls the road, and development departments fee code compliance. Your ADU builder’s job is to choreograph those gamers so that inspections come inside the properly order. For example, the ditch for a shared software trail may perhaps need inspection by using the capability software, the water district for the carrier line and backflow, and the building inspector for conduit depth and separation. If that trench will get backfilled too early, you'll be able to reopen it.
Expect two to three application inspections beyond fashioned constructing inspections. If your ADU development institution claims they may be able to build in eight weeks, ask how they account for application lead instances. Transformer upgrades can take eight to 16 weeks in busy regions. Water meter swaps is likely to be swift or gradual relying on staffing. If your time table presentations backfill earlier inspections, press pause.
A simple means list you may use with your team
- Electrical: panel and service rating established, load calculation for equally dwellings, software stance on subfeed vs. devoted meter, EV and heat pump lots accounted for, system locations mapped with clearances.
- Water: meter size and pressure validated, service line textile proven, route to ADU deliberate at acceptable intensity, backflow and shutoff specifications famous, submeter determination made if favored.
- Sewer: camera inspection finished with map and intensity, slope feasibility checked, connection strategy selected, pump want evaluated, capability costs confirmed with the district.
- Gas: coverage decision on all-electric powered vs. gas, available BTU ability if with the aid of present equipment, meter and regulator plan if including fuel, venting and combustion air routes pointed out.
- Data and stormwater: devoted information conduit planned, roof drainage routes designed with discharge destinations, infiltration necessities and fire get right of entry to notes captured.
Print it, hand it for your ADU execs, and make them preliminary every one line previously layout locks.
Picking the correct companion and placing expectations
The good ADU execs do no longer draw back after you ask approximately service so much, meter sizes, and sewer slope. They pull out a notepad and caricature. They name the software planner formerly deposit tests clean. They recognise in which to push for exceptions and in which to comply with the regulation. A pro ADU contractor may even lend a hand you make possibilities that diminish height rather a lot: heat pump water heaters with timers, call for-responsive panels, or shared-laundry designs while relevant.
If you’re in search of an ADU development close to me or interviewing an accessory dwelling unit builder, ask for two examples in which they averted a service improve. Ask for one example the place they instructed an improve and why. The thoughts will tell you more than a glossy brochure. A custom ADU builder must communicate exchange-offs it seems that. Separate electrical carrier presents meter independence, however can take months for application approval. Sharing the foremost condominium water line is instant, however can also scale back rigidity at peak times should you bypass a meter upgrade. Trenching because of a driveway adds value, however typically avoids root injury that may cause a tree replacement requirement. There is no single appropriate resolution, basically a in shape to your lot and finances.
Edge instances that deserve more attention
Sloped tons create atypical alternatives. If the ADU sits downhill from the street most important however uphill from the existing residence lateral, gravity works. If it sits lessen than equally, a sewer pump is unavoidable until you reroute deep. Corner heaps basically have two a possibility sewer mains, one closer however shallower, the other deeper with stronger fall. I’ve selected the longer route more than as soon as to ward off a pump and long run complications.
Historic districts layer constraints on meter areas and external tools. You may perhaps want to hide a warmth pump condenser at the back of a lattice or region the electrical meter on a part elevation. Plan package displays early, or you'll be moving tools late.
Wildland-urban interface zones can require defensible house around the ADU and might avert chronic manufacturer equipment in precise zones. Check clearances for transformers and disconnects if your ADU sits near the rear fence the place brush abuts the assets.
Flag a lot and panhandle driveways complicate entry for the software crews. If a bucket truck should not attain the pole at the back of your private home, the application might also require a brand new pole place or an underground lateral from a exceptional course. I have coordinated weekend crane alternatives for pad-mount transformers in tight communities, and the rate and time table affect became proper. Better to gain knowledge of that formerly you draw the ADU’s porch.
Design choices that lighten the software load
Smart design trims means. A single compact bog middle stacked with the kitchen retains plumbing short and listen vents. A one hundred twenty-volt heat pump water heater attracts much less than 0.5 the spike of a tankless fuel with its fan and ignition, and avoids the desire for committed fuel. Induction cooking looks like gasoline devoid of the combustion merchandise, and it slashes ventilation needs. Mini-split warmth pumps with one or two indoor heads serve so much ADUs properly, with outdoor contraptions positioned on vibration pads far from bedroom windows. Low-movement fixtures are known now, however I still specify 1.28 gpf toilets and EPA WaterSense showers to hold water call for modest. These selections customarily suggest which you can hinder upsizing the water meter and carrier.
On the electric facet, a load-losing shrewd panel can dynamically pause the water heater at some point of an EV rate, permitting the two dwellings to percentage a 200-amp provider. Right-sizing lighting fixtures with LEDs and proscribing exterior lighting fixtures to obligatory paths helps to keep the bottom load down. These are the information a thoughtful ADU constructing facilities workforce will fold into their specifications so you hinder overbuilding the spine.
The role of documentation: draw it as you’ll construct it
When I get ready production information for an ADU, I insist on utility plans with genuine distances, depths, and components. A imprecise observe that reads “run new electrical to ADU” leaves room for disputes. A plan that indicates a 60-amp subfeed in 1.25-inch PVC, 24 inches burial depth, 18-inch separation from water, and stub-america particular areas makes inspections smoother. The identical goes for water and sewer: specify pipe sizes, slopes, cleanouts, and backflow contraptions. Add a aspect for the ejector basin if used, with vent routing and alarm position. The ADU installation amenities workforce exhibits up with the perfect equipment, and the ADU structure professionals can payment thoroughly.
Keep copies of utility approvals inside the allow set: service upgrade letters, water meter upsizing confirmations, and sewer capacity commission receipts. Inspectors appreciate seeing them with out exploring through emails. When you promote or refinance, that record proves the ADU will never be a bootleg.
When to bring in specialists
Most ADU contractors deal with standard application coordination, yet aspect circumstances call for engineers. A civil engineer is price their rate should you touch the street for sewer or while stormwater calls for infiltration layout. An electric engineer’s load calc includes weight with utilities for those who’re near the decrease. A geotechnical engineer facilitates in the event you trench close mammoth timber and desire to give protection to roots or while soil consists of prime groundwater with reference to trench depths. These experts can also be engaged surgically. A just right ADU creation agency knows who to call and when.
If you are performing as owner-builder, remember hiring an ADU gurus package deal for preconstruction in basic terms. A half-day talk to to review utilities, operate a load calc, and sketch a trench plan can shop weeks and hundreds of thousands. Then one can still bid the training session to a mix of trades with a transparent scope.
Pulling it jointly: a pragmatic direction to a livable ADU
The cleanest ADU builds I’ve managed accompanied a steady rhythm. We mapped utilities early, made two or three design transformations to recognize slope and panel space, then submitted a permit set with precise numbers. While the urban reviewed the plans, we queued application programs for any enhancements. As soon as permits issued, we opened the ditch as soon as, positioned vitality, water, sewer, and knowledge to the ADU, and invited all central inspectors in a two-day window. The slab or basis accompanied with self assurance that not anyone might ask us to reopen the backyard. Framing and finishes ran devoid of software surprises, and the final signal-offs felt ordinary.
If you are taking in simple terms one lesson from this tick list, let it's this: utilities aren't an afterthought, they're the backbone. A customized ADU builder who treats them that manner will come up with a more easy, sooner, and more predictable project. Whether you pick a full ADU design and construct agency or collect your own ADU contractor workforce, press for specifics on potential, routing, and approvals. Clarity now continues your long run tenant from showering in a trickle or resetting a sewer pump alarm at nighttime.
When you look for an ADU contractor close to me, hear for the ones who lead with questions on your meter, your panel, your sewer cleanout, and your water tension. Those are the ADU production authorities who will help you dwell effectively for your new area, with no surprises underneath the soil.