Main phases of repair in the home 30925
Main phases of repair in the apartment.
How to begin repair works of the apartment?
The very first phase of the repair work of old homes is affordable best plumber the destruction and dismantling firstly of the dilapidated walls and partition walls, removing the wall and ceiling covering. This phase is one of the most "dirty" phases of the repair.
One more among the most important and "dusty" works is the window block replacement. It is needed to do this to start with because dirt and dust will be unallowable throughout following stages and it is restricted at all to open windows throughout painting and wallpaper works (big drops of the temperature level and wetness are unallowable). After installing windows and windowsills it is essential to pack them instantly in polyethylene film and to cover windowsills in addition by the fiber board (in order to avoid scratches).
The following phase is wiring. Circuitry can be installed in walls or along the floor. Electrical wiring is made inside the pipes to top-rated plumber near me guarantee electrical safety and boost dependability. The pipeline secures electrical wiring from external damages and permits to change the wire completely without breaking walls and flooring merely by placing the new wire instead of the old one.
House Painting follows the electrical wiring. The frequent mistake during the simultaneous conducting of such works takes place when workers forget to set out among the cables and house painters have actually currently plastered and smoothed out the wall. As an outcome, additional works are necessary to seal chases on the completed wall. The locations of the feed switch and wall outlet place and their number must be thought-out in advance. The scheme of power circuitry is usually included into the design project.
Later on the system need to be all set to service in case of failures. In addition to the wirings, the telephone cable television and the TV cable television are set out. The power cable television should not be laid out near the telephone and antenna cable televisions to prevent noise pickup and interference. The most strange minute is setting out the television cable television. In order to make 2 (or three) TV sets in the house the second cable is frequently just "securely soldered" in parallel, so the cable resistance is lowered. As a result, the display screen quality is degraded, many programs can't be received and etc. In order to avoid such circumstance it is required to welcome an expert with unique equipment. He will measure the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.
Painting is the most long-term process, that is why it is conducted all at once in all properties, if it is possible. Delays are linked with the technology. Each used layer of the plaster (or completing finishing) top plumbing contractors need to dry totally before the work will continue.
Works in hygienic arrangements and the kitchen begin simultaneously with house painting. It is much better to satisfy so-called "filthy" operate in the first place and simultaneously. In accordance with the plan of the hygienic professional place welding, wall chasing and pipe run are performed. Steam radiator admissions are prepared, taps and brackets are installed, however radiators are not installed.
Then works in hygienic arrangements are conducted according to the plan. The bath is installed, then walls are smoothed out and the tile is laid on walls. The list below stage is assembling ceiling and laying tiles on the floor. And at last other hygienic devices, mixers and devices are mounted.
After circuitry, setup of rosette plates and terminal boxes the voltage is checked in all point. Ends of circuitry are insulated and set out into rosette plates. Sockets and breakers are not installed during this phase in order to save their surface area appearance. The finish puttying of walls is conducted all at once. The technologically exact control of drying of the layer of the plaster (filling) is carried out by drymeter. It is a special instrument that determines wetness of the material.

The following phase is the process of fill. Fill can be made with various products-- from usual masonry cement-sand mixture to self-aligning floorings. The advantage of the easy mix is its cheapness, the drawback is that such mix is much more difficult aligned at the level and the last dry time of such fill is 40 days, just then the next phase of the work with flooring can be performed, i.e. the period is too long. Self-leveling self-aligning floors are far more pricey, however more technological. Lining up takes place practically "immediately" i.e. fluid service of mixture is poured out, then it runs and you get the horizontal surface area. The last dry time is 15 days i.e. you have significant time economy. The system "warm flooring" is installed into the fill. If the so-called "wet procedures" are inapplicable the innovation of the dry aligning (the fill innovation) is utilized bases for floors with adjustable flooring battens are mounted.
After fill door boxes and door are set up. Installation of doors should take into the account density of future floor covering. After installation the door can be taken off its hinges and eliminated till completion of repair or packed into polyethylene film to protect from damages. Concurrently ceiling can be painted and the tile can be laid in that premises where it was planned. The tile must be laid on the absolutely dry overlay.
Finishing of the flooring mounting depends upon the planned covering. For the most part (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are repaired to the floor by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to offer the close fixing of plywood and long-lasting service of the flooring without squeak and bulging. The plywood offers the extra heat- and acoustic insulation. After mounting of the plywood is finished, wallpaper for painting can be pasted on walls.
In premises where surface covering of the flooring is laminated floor covering or parquet hoard, the normal wallpapers are pasted (not for painting) in the very first place. Then the floor covering is mounted.
If finish covering of the floor is the block parquet, the parquet is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the regular wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending on the quality of the parquet and lacquer). The pointed out effect is linked only with such rushing procedure when the great quantity of dust is developed. In spite of the reality that great flooring grinders are geared up with the vacuum, the adequate quantity of dust is sped up on surrounding topics including walls. Dust is extremely acerbic and is terribly cleaned off. That is why in order not to harm wallpapers, they are pasted after rushing and in order the parquet do not absorb the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.
After this the primary works can be considered to be finished. It is left only to install the plinths, decorative aspects, breakers and sockets, curtain holders, to hang doors, plant-bands and others.
In conclusion it is necessary to note that the series of works was noted in basic and can alter depending on the guaranteed situation-- the number of rooms in premise, your resources, peculiarities of the building of the multilevel facilities. It is based upon sound judgment professional plumbing service and everyone capable of analysis can individually create such a series.