Main phases of repair works in the apartment 72689
Main stages of repair works in the apartment.
How to start repair works of the apartment?
The very first stage of the repair work of old apartment or condos is the destruction and taking apart first off of the shabby walls and partition walls, eliminating the wall and ceiling coating. This stage is one of the most "unclean" stages of the repair work.
One more amongst the most important and "dirty" works is the window quality best plumbing company block replacement. It is essential to do this first off due to the fact that dirt and dust will be unallowable during following phases and it is forbidden at all to open windows during painting and wallpaper works (large drops of the temperature level and moisture are unallowable). After mounting windows and windowsills it is essential to pack them immediately in polyethylene movie and to cover windowsills in addition by the fiber board (in order to prevent scratches).
The following phase is circuitry. recommended top plumbers Circuitry can be installed in walls or along the floor. Circuitry is made inside the pipes to ensure electrical security and increase dependability. The pipeline protects wiring from external damages and enables to replace the wire completely without breaking walls and flooring merely by inserting the brand-new wire instead of the old one.
House Painting follows the circuitry. The frequent error throughout the simultaneous conducting of such works takes place when employees forget to lay out one of the cables and house painters have already plastered and smoothed out the wall. As a result, additional works are necessary to seal chases after on the ended up wall. The locations of the feed switch and wall outlet location and their number should be thought-out ahead of time. The scheme of power circuitry is typically consisted of into the style project.
Later on the system should be ready to service in case of failures. In addition to the electrical wirings, the telephone cable and the television cable are set out. The power cable television should not be set out near the telephone and antenna cable televisions to prevent noise pickup and interference. The most peculiar minute is laying out the TV cable. In order to make two (or three) TV sets in the house the second cable television is frequently merely "strongly soldered" in parallel, so the cable television resistance is decreased. As a result, the display screen quality is weakened, many programs can't be gotten and etc. In order to prevent such scenario it is necessary to welcome an expert with unique devices. He will measure the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.
Painting is the most long-lasting procedure, that is why it is conducted all at once in all premises, if it is possible. Delays are related to the innovation. Each applied layer of the plaster (or filling out ending up) need to dry totally before the local plumber near me work will continue.
Works in sanitary arrangements and the cooking area start simultaneously with house painting. It is much better to meet so-called "unclean" works in the first place and at the same time. In accordance with the plan of the sanitary professional area welding, wall chasing and pipe run are carried out. Steam radiator admissions are prepared, taps and brackets are installed, but radiators are not installed.
Then works in sanitary arrangements are conducted according to the plan. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The following stage is putting together ceiling and laying tiles on the flooring. And at last other hygienic devices, mixers and accessories are mounted.
After wiring, setup of rosette plates and terminal boxes the voltage is checked in all point. Ends of wiring are insulated and laid out into rosette plates. Sockets and breakers are not set up throughout this stage in order to save their surface area look. The surface puttying of walls is conducted all at once. The technically specific control of drying of the layer of the plaster (filling) is performed by drymeter. It is a special instrument that determines wetness of the material.
The following phase is the procedure of fill. Fill can be made with different materials-- from typical masonry cement-sand mix to self-aligning floors. The benefit of the simple mixture is its cheapness, the downside is that such mix is much more difficult lined up at the level and the last dry time of such fill is 40 days, only then the next stage of the deal with flooring can be performed, i.e. the duration is too long. Self-leveling self-aligning floors are much more expensive, but more technological. Aligning takes place practically "instantly" i.e. fluid service of mixture is poured out, then it runs and you get the horizontal surface. The last dry time is 15 days i.e. you have considerable time economy. The system "warm flooring" is set up into the fill. If the so-called "damp processes" are inapplicable the technology of the dry aligning (the fill innovation) is utilized bases for floors with adjustable floor battens are mounted.
After fill door boxes and door are installed. Installation of doors must take into the account thickness of future floor covering. After setup the door can be taken off its hinges and eliminated until the end of repair or packed into polyethylene film to safeguard from damages. At the same time ceiling can be painted and the tile can be laid in that premises where it was prepared. The tile needs to be laid on the definitely dry overlay.
Finishing of the floor installing depends on the prepared covering. For the most part (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the floor by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to provide the close fixing of plywood and long-lasting service of the flooring without squeak and bulging. The plywood gives the extra heat- and acoustic insulation. After mounting of the plywood is completed, wallpaper for painting can be pasted on walls.
In facilities where finish covering of the flooring is laminated flooring or parquet stockpile, the ordinary wallpapers are pasted (not for painting) in the first location. Then the flooring covering is mounted.

If surface covering of the flooring is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the regular licensed plumbing company wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The mentioned consequence is connected just with such scrambling process when the terrific quantity of dust is produced. In spite of the fact that great floor mills are geared up with the vacuum, the sufficient quantity of dust is sped up on surrounding subjects including walls. Dust is really acerbic and is badly washed off. That is why in order not to harm wallpapers, they are pasted after rushing and in order the parquet do not soak up the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.
After this the primary works can be thought about to be finished. It is left only to install the plinths, decorative aspects, breakers and sockets, curtain holders, to hang doors, plant-bands and others.
In conclusion it is necessary to keep in mind that the sequence of works was listed in basic and can alter depending upon the definite circumstance-- the number of rooms in property, your resources, peculiarities of the building of the multilevel premises. It is based on good sense and every person capable of analysis can separately create such a sequence.