Main stages of repair in the apartment

From Wiki Planet
Jump to navigationJump to search

Main phases of repair works in the apartment.

How to begin repair of the apartment?

The very first stage of the repair of old apartment or condos is the destruction and taking apart first of all of the dilapidated walls and partition walls, eliminating the wall and ceiling finish. This stage is one of the most "dirty" phases of the repair.

One more among the most crucial and "dusty" works is the window block replacement. It is necessary to do this first off since dirt and dust local plumber near me will be unallowable throughout following phases and it is prohibited at all to open windows throughout painting and wallpaper works (big drops of the temperature level and wetness are unallowable). After installing windows and windowsills it is essential to pack them right away in polyethylene film and to cover windowsills in addition by the fiber board (in order to avoid scratches).

The following stage is electrical wiring. Electrical wiring can be set up in walls or along the flooring. Circuitry is made inside the pipes to ensure electrical safety and increase dependability. The pipe protects electrical wiring from external damages and enables to change the wire entirely without breaking walls and flooring simply by placing the new wire rather of the old one.

House Painting follows the circuitry. The regular mistake during the synchronised conducting of such works occurs when workers forget to lay out one of the cable televisions and house painters have already plastered and ravelled the wall. As an outcome, additional works are essential to seal chases after on the finished wall. The places of the feed switch and wall outlet area and their number should be thought-out in advance. The plan of power electrical wiring is generally consisted of into the design project.

Later on the system should be all set to service in case of failures. In addition to local best plumber the circuitries, the telephone cable television and the TV cable television are laid out. The power cable must not be laid out near the telephone and antenna cable televisions to avoid sound pickup and interference. The most strange moment is setting out the TV cable television. In order to make 2 (or three) TV sets in the apartment or condo the second cable is often simply "strongly soldered" in 24/7 plumbing service parallel, so the cable resistance is reduced. As a result, the display quality is deteriorated, many programs can't be gotten and etc. In order to avoid such situation it is required to invite an expert with special equipment. He will measure the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.

Painting is the most long-term procedure, that is why it is carried out all at once in all properties, if it is possible. Delays are linked with the innovation. Each applied layer of the plaster (or completing completing) should dry totally before the work will continue.

Works in hygienic plans and the kitchen area begin simultaneously with house painting. It is much better to fulfill so-called "filthy" operate in the top place and simultaneously. In accordance with the strategy of the sanitary technician place welding, wall chasing and pipeline run are conducted. Steam radiator admissions are prepared, taps and brackets are installed, however radiators are not installed.

Then operates in sanitary arrangements are performed according to the plan. The bath is installed, then walls are smoothed out and the tile is laid on walls. The list below stage is putting together ceiling and laying tiles on the floor. And at last other sanitary gadgets, mixers and accessories are mounted.

After electrical wiring, installation of rosette plates and terminal boxes the voltage is checked in all point. Ends of wiring are insulated and set out into rosette plates. Sockets and breakers are not installed during this stage in order to conserve their surface area look. The surface puttying of walls is carried out at the same time. The technologically exact control of drying of the layer of the plaster (filling) is performed by drymeter. It is an unique instrument that determines wetness of the material.

The following phase is the process of fill. Fill can be made with different products-- from typical masonry cement-sand mixture to self-aligning floors. The advantage of the simple mixture is its cheapness, the downside is that such mix is much more difficult lined up at the level and the last dry time of such fill is 40 days, only then the next stage of the deal with floor can be carried out, i.e. the period is too long. Self-leveling self-aligning floors are a lot more pricey, however more technological. Lining up occurs nearly "automatically" i.e. fluid solution of mixture is put out, then it runs and you get the horizontal surface. The last dry time is 15 days i.e. you have considerable time economy. The system "warm floor" is set up into the fill. If the so-called "wet procedures" are inapplicable the technology of the dry aligning (the fill innovation) is utilized bases for floorings with adjustable flooring battens are mounted.

After fill door boxes and door are set up. Setup of doors must take into the account thickness of future flooring covering. After installation the door can be taken off its hinges and removed till completion of repair work or packed into polyethylene movie to secure from damages. All at once ceiling can be painted and the tile can be laid in that premises where it was planned. The tile must be laid on the definitely dry overlay.

Finishing of the flooring installing depends on the planned covering. In most cases (if finish covering experienced plumbing company is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are repaired to the flooring by self-tapping screws. One plywood sheet is repaired by 30-50 self-tapping screws to supply the close fixing of plywood and long-lasting service of the flooring without squeak and bulging. The plywood offers the additional heat- and acoustic insulation. After installing of the plywood is completed, wallpaper for painting can be pasted on walls.

In properties where surface covering of the flooring is laminated flooring or parquet stockpile, the common wallpapers are pasted (not for painting) in the very first location. Then the flooring covering is mounted.

If surface covering of the flooring is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the common wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending on the quality of the parquet and lacquer). The mentioned effect is connected only with such rushing quality best plumber process when the terrific amount of dust is created. In spite of the reality that great floor mills are equipped with the vacuum cleaner, the sufficient quantity of dust is precipitated on surrounding subjects including walls. Dust is extremely acerbic and is badly cleaned off. That is why in order not to harm wallpapers, they are pasted after rushing and in order the parquet do not soak up the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.

After this the main works can be considered to be ended up. It is left only to install the plinths, ornamental elements, breakers and sockets, curtain holders, to hang doors, plant-bands and others.

In conclusion it is required to keep in mind that the sequence of works was noted in basic and can change depending upon the guaranteed situation-- the variety of rooms in premise, your resources, peculiarities of the building and construction of the multilevel properties. It is based upon common sense and every person efficient in analysis can separately produce such a series.