Main stages of repair in the home

From Wiki Planet
Jump to navigationJump to search

Main stages of repair in the apartment.

How to start repair of the apartment?

The very first stage of the repair work of old apartment or condos is the destruction and taking apart first off of the worn out walls and partition walls, eliminating the wall and ceiling covering. This phase is one of the most "filthy" stages of the repair.

One more among the most essential and "dusty" works is the window block replacement. It is essential to do local best plumber this first off due to the fact that dirt and top plumbing company dust will be unallowable throughout following phases and it is prohibited at all to open windows during painting and wallpaper works (big drops of the temperature level and moisture are unallowable). After mounting windows and windowsills it is required to load them instantly in polyethylene film and to cover windowsills in addition by the fiberboard (in order to avoid scratches).

The following stage is circuitry. Wiring can be set up in walls or along the floor. Electrical wiring is made inside the pipes to guarantee electrical security and boost dependability. The pipeline safeguards wiring from external damages and allows to replace the wire totally without breaking walls and flooring merely by inserting the brand-new wire rather of the old one.

House Painting follows the electrical wiring. The frequent mistake during the synchronised conducting of such works happens when employees forget to set out one of the cable televisions and home painters have actually already plastered and smoothed out the wall. As an outcome, additional works are needed to seal chases after on the completed wall. The locations of the feed switch and wall outlet area and their number should be thought-out ahead of time. The plan of power circuitry is typically consisted of into the design project.

Later on the system need to be all set to service in case of failures. In addition to the electrical wirings, the telephone cable television and the TV cable television are laid out. The power cable need to not be set out near the telephone and antenna cable televisions to avoid sound pickup and disturbance. The most peculiar minute is setting out the TV cable television. In order to make two (or 3) TV sets in the home the 2nd cable television is frequently simply "firmly soldered" in parallel, so the cable television resistance is decreased. As an outcome, the display quality is degraded, numerous programs can't be gotten and etc. In order to prevent such scenario it is essential to invite a specialist with unique devices. He will measure the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.

Painting is the most long-term procedure, that is why it is performed simultaneously in all facilities, if it is possible. Delays top plumbers in my area are linked with the innovation. Each applied layer of the plaster (or filling out completing) must dry completely before the work will continue.

Works in hygienic arrangements and the kitchen begin simultaneously with house painting. It is better to satisfy so-called "dirty" operate in the top place and simultaneously. In accordance with the strategy of the hygienic specialist location welding, wall chasing and pipe run are carried out. Steam radiator admissions are prepared, taps and brackets are installed, but radiators are not installed.

Then operates in sanitary arrangements are performed according to the strategy. The bath is installed, then walls are smoothed out and the tile is laid on walls. The list below phase is putting together ceiling and laying tiles on the flooring. And at last other sanitary devices, mixers and devices are mounted.

After circuitry, installation of rosette plates and terminal boxes the voltage is checked in all point. Ends of circuitry are insulated and set out into rosette plates. Sockets and breakers are not installed throughout this stage in order to save their surface area look. The surface puttying of walls is carried out at the same time. The technically specific control of drying of the layer of the plaster (filling) is carried out by drymeter. It is an unique instrument that determines moisture of the material.

The following phase is the procedure of fill. Fill can be made with various products-- from normal masonry cement-sand mix to self-aligning floors. The benefit of the basic mix is its cheapness, the drawback is that such mixture is much harder lined up at the level and the final dry time of such fill is 40 days, just then the next phase of the work with floor can be conducted, i.e. the duration is too long. Self-leveling self-aligning floorings are far more pricey, but more technological. Aligning occurs nearly "instantly" i.e. fluid service of mix is poured out, then it runs and you receive the horizontal surface area. The last dry time is 15 days i.e. you have significant time economy. The system "warm floor" is installed into the fill. If the so-called "wet procedures" are inapplicable the technology of the dry lining up (the fill technology) is utilized bases for floors with adjustable floor battens are mounted.

After fill door boxes and door are set up. Installation of doors should take into the account thickness of future flooring covering. After setup the door can be removed its hinges and got rid of until completion of repair or loaded into polyethylene movie to safeguard from damages. All at once ceiling can be painted and the tile can be laid in that premises where it was prepared. The tile needs to be laid on the absolutely dry overlay.

Finishing of the flooring installing depends upon the prepared covering. In many cases (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the flooring by self-tapping screws. One plywood sheet is repaired by 30-50 self-tapping screws to supply the close repairing of plywood licensed plumber near me and long-lasting service of the flooring without squeak and bulging. The plywood provides the extra heat- and acoustic insulation. After installing of the plywood is completed, wallpaper for painting can be pasted on walls.

In properties where finish covering of the floor is laminated flooring or parquet stockpile, the ordinary wallpapers are pasted (not for painting) in the first place. Then the flooring covering is mounted.

If finish covering of the floor is the block parquet, the parquet is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the regular wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The mentioned consequence is connected just with such scrambling process when the terrific quantity of dust is created. In spite of the truth that great flooring grinders are geared up with the vacuum cleaner, the enough quantity of dust is sped up on surrounding topics including walls. Dust is very acerbic and is severely washed off. That is why in order not to affordable best plumber damage wallpapers, they are pasted after rushing and in order the parquet do not take in the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.

After this the main works can be thought about to be finished. It is left only to install the plinths, ornamental components, breakers and sockets, curtain holders, to hang doors, plant-bands and others.

In conclusion it is necessary to keep in mind that the sequence of works was noted in general and can alter depending upon the certain scenario-- the variety of spaces in premise, your resources, peculiarities of the construction of the multilevel facilities. It is based upon good sense and everyone capable of analysis can individually produce such a sequence.